How Long Do Custom Cabinets Take?

The honest timeline from first meeting to finished kitchen — and what can speed it up or slow it down.

Get a Free Estimate

Get a Free Cabinet Design Consultation

Tell us about your project — kitchen, bath, closets, or something custom — and the best way to reach you. We'll respond with next steps and a clear path to your written quote.

The Short Answer

From the first design meeting to a finished kitchen, most custom cabinet projects take 8 to 14 weeks. Small projects like a single vanity can finish in 4 to 6 weeks. Large whole-home jobs can run 16 weeks or more.

The Five Phases

1. Design and quoting: 1 to 3 weeks

You meet with the cabinet maker, talk through your needs, and get measurements. They draw up a design and a written quote. This phase moves at your speed — deciding on door styles, finishes, and storage options takes some homeowners a week and others a month. Bring ideas and photos to speed things up. Our choosing a cabinet maker guide helps you find a designer who listens.

2. Engineering and ordering: 1 to 2 weeks

Once you approve the design, the shop turns drawings into cut lists and orders lumber, hardware, and finish materials. Special-order items — unusual hardware, exotic wood, custom glass — can add time here if they ship from far away.

3. Build: 4 to 8 weeks

This is the longest phase. The shop mills the lumber, builds the boxes, shapes the doors, applies the finish, and lets everything cure. Painted finishes need extra cure time — rushing this step is how you get soft paint that chips. A good shop will not skip it, and neither should you.

4. Delivery and installation: 1 to 2 weeks

Installers set the cabinets level and plumb, scribe them to your walls, hang the doors, and adjust every hinge and drawer. Most kitchens install in 3 to 5 days. Complex jobs with tall ceilings or tricky walls take longer. Our cabinet installation page covers what good installation looks like.

5. Touch-ups and final walkthrough: a few days

After install, the crew fills nail holes, touches up paint, and walks the job with you. Point out anything that bothers you — this is the moment to speak up, not six months later.

What Slows Projects Down

How to Keep Your Project on Schedule

Pick your maker early and sign the design before you need it. Order appliances early too — installers need exact appliance specs to size the openings. Keep one decision-maker for the household; designs approved by committee take twice as long. And build a buffer into your plans. If you need the kitchen done by Thanksgiving, start the process in August, not October.

If your timeline is tight, ask about cabinet refacing. Refacing reuses your existing boxes and finishes in days instead of months — the right call when the layout works and you just want a fresh look fast.

Living Through the Project

Most of the timeline happens in the shop, not your home — your kitchen stays usable until installation week. During install, set up a temporary kitchen with a microwave, a coffee maker, and paper plates in another room. Dust gets everywhere during demolition, so cover nearby furniture and vents.

Rush Jobs: Can You Speed It Up?

Sometimes. Some shops keep standard door styles and popular finishes in a faster rotation, or they have a gap in the schedule they want to fill. If your design uses common materials and you approve everything immediately, a shop might shave two to three weeks off the normal timeline.

But there are steps that cannot be rushed without hurting quality. Finish cure time is the big one — paint and topcoats need days to harden fully, and installing soft-finished cabinets guarantees chips and callbacks. Lumber also needs to acclimate to Florida humidity before it is cut, or doors can warp after installation. A shop that promises to cut the timeline in half is cutting corners somewhere. Ask which steps they are shortening, and think hard about the answer.

Planning Around Life Events

Work backward from your deadline, then add a buffer. Selling the house in June? Start the cabinet process in January. Hosting Thanksgiving? Begin in June or July — fall is the busiest season for every cabinet shop in Orlando, and material deliveries slow around the holidays.

Also plan around your own life. Installation week is loud, dusty, and kitchen-free. Do not schedule it the same week as houseguests, a new baby, or a major work deadline. If anyone in the home works nights and sleeps days, talk to the shop about work hours before demolition starts.

What a Good Schedule Looks Like

A professional shop gives you a written schedule with real dates: design approval deadline, material order date, build start, delivery date, installation days, and final walkthrough. It also tells you what they need from you and when — appliance specs by this date, finish selections locked by that date, the house cleared for install by another.

Your job in keeping the schedule is making decisions on time. Every day a finish choice sits undecided is a day the schedule slips. One practical trick: make all your selections — wood, door style, finish, hardware, storage extras — in one or two focused sessions instead of deciding piece by piece over weeks. Bring photos of kitchens you like, know your must-haves, and trust your gut on the small stuff.

Communication matters too. A good shop updates you when phases complete or when something changes. If you have not heard anything for three weeks mid-build, call and ask. Silence is not always a problem, but you should never have to wonder.

Want a realistic schedule for your specific project? Request a free consultation and we will map out each phase with real dates for your kitchen.

Frequently Asked Questions

How long does it take to get custom cabinets from order to install?

Most projects run 8 to 14 weeks from the signed design to finished installation. The build phase in the shop is the longest part, usually 4 to 8 weeks. Small projects can finish faster.

What is the fastest way to get new-looking cabinets?

Cabinet refacing is fastest — new doors, drawer fronts, and veneer on your existing boxes, usually done in 3 to 5 days. Stock cabinets from a big-box store are next fastest. Full custom takes the longest but gives the best fit and quality.

Can I use my kitchen while cabinets are being built?

Yes. The cabinets are built in the shop, so your kitchen stays normal until installation week. Only the 3 to 5 days of installation and touch-ups disrupt your routine.

Why do custom cabinets take so long to build?

Each piece is cut, shaped, assembled, sanded, finished, and cured for your specific kitchen — nothing is pulled from a warehouse shelf. Painted finishes especially need real cure time so the paint hardens properly and does not chip.

When should I start planning if I want cabinets by the holidays?

Start at least 4 to 5 months ahead. Shops back up in fall, materials can be slow, and you want a buffer for surprises. Starting in late summer for a holiday deadline is about right.